Sidewalks, steps, and more

We’ve been working toward finalizing site work with the installation of sidewalks, steps, and handrails at and between Waterman Buildings 100 (the Welcome Center) and 200 (the new shelter building). The walkway that connects the two buildings is now in place, and we’ve also installed new concrete steps at the back of Bldg. 100, connecting…

Read More